• Newsletters

    PipelineSOLUTIONS

    Read the latest issue of the Pipeline Solutions newsletter here. To receive these in your in-box every month, please complete the form to the right and submit.  

    JANUARY 2021 - Volume 16, Issue 1




    News Items

    PLM releases new pipelayer solution - the 71H

    by User Not Found | Jun 09, 2014
    CYPRESS, TX – PipeLine Machinery International (PLM) announces the release of the 71H pipelayer. With the support of Caterpillar® and the engineering expertise of Vanguard Equipment Inc., the challenge was met to create a utility-capacity pipelayer in the Tier 4 Interim/EU Stage IIIB class, designed for lifting 27 215 kg (60,000 lb.) and engineered to meet the most exacting standards in the world.

    Features include:

    •  Standard electro-hydraulic tractor control, dedicated hydraulics, differential steering and machine control systems.
    • Boom and hook draw works are driven by independent hydraulic winches.  
    •  The compact design of the counterweight provides maximum lift capability and optimum weight distribution.  
    •  The drawbar is able to accommodate a wide range of attachments.
    •  Roll Over Protection Structure (ROPS) and Quick Drop function on load line control.
    •  Heavy duty undercarriage. Standard 600 mm (23.6 in.) single grouser shoe, LGP configuration.
    •   Standard 6.1 m (20 ft.) boom with large box section.

    The company’s worldwide activities are currently supported through the corporate office in Cypress, Texas, USA; Edmonton, Alberta, Canada; The Hague, Netherlands; Beijing, China; and Melbourne, Australia.

     

    For further information, check out the 71H page or contact your account manager. 

    两男吃我奶头一边一个